Bullfrog Gold Stakes Additional Mining Claims

 

GRAND JUNCTION, CO - Bullfrog Gold Corp. has staked an additional 160 lode mining claims around its Newsboy Project located 45 miles NW of Phoenix, Arizona. These claims were recorded on March 15, 2013 with the US Bureau of Land Management and Maricopa County in Arizona. Many shallow shafts, prospect pits and significant mineralized outcrops are present on these new claims, but no significant exploration has been conducted and there are no records of historic production. Project land holdings now approximate 7,400 acres within 250 lode claims, 12 placer claims, 3 State Exploration permits and two patented claims, much of which has been intensely altered by hydrothermal mineralizing solutions.

The Company's Phase 3 drill program was completed on March 9, 2013 and included 8,340 feet of drilling in 26 holes. Remaining Phase 3 results will be released upon receipt and study of final assays and drill data. Upon converting all relevant historic drill data in electronic format, the Company plans to engage an independent group to update resources before the end of 2013.

Bullfrog Gold Corp. controls two projects in Nevada, one of which is in the Bullfrog District that produced 2.5 million ounces of gold between 1988 and 1998 and the other has good potential for shallow silver with base metal and barite byproducts.